Skip to main content
Guide

Importing from Türkiye: a practical guide

Lead times, the Customs Union and the A.TR certificate, VAT and TARIC, and the documents for each shipment, explained for buyers working with a Turkish manufacturer.

Lead times

How long an order takes

A truck from Türkiye takes about a week to reach Spain. Including production, a typical order arrives in 3-4 weeks; each manufacturer confirms its lead time in the quotation.

Road transport
≈ 1 week
Typical order, including production
3-4 weeks
Time difference with Spain
1-2 h

Indicative lead times for road shipments from Türkiye; each quotation gives its own.

Before you order

Customs Union, taxes and orders to measure

A.TR

Customs Union with the EU

Industrial goods in free circulation in Türkiye enter duty-free with an A.TR certificate. It does not cover unprocessed agricultural products or coal and steel, and import VAT is still payable.

TARIC

VAT, TARIC and trade measures

Before importing, check each product’s tariff code in TARIC: it shows the VAT and any anti-dumping or safeguard measures the EU applies to that product, including when it comes from Türkiye.

Batches

Orders to measure

Many Turkish plants accept short runs and specification changes. Each manufacturer sets its own minimum order.

Documentation

The documents for each shipment

Invoice and packing list

With the description, tariff code and weight of the goods, as customs needs them.

A.TR or proof of origin

The A.TR for industrial goods under the Customs Union; for those it does not cover, the relevant proof of origin.

Product documents

Datasheets and certificates.

Customs clearance is done by a customs representative (your forwarder or customs agent). We coordinate with them and prepare the manufacturer’s documentation.

Manufacturers

Manufacturers in Türkiye we represent

  • Egglin
  • Tunanets
  • Garanti Kompozit
Frequently asked questions

What buyers usually ask us

Is importing from Türkiye free of any tax?

Not quite. Industrial goods with an A.TR pay no customs duty, but import VAT is still due, unprocessed agricultural products and steel have their own regime, and some goods are subject to anti-dumping or safeguard measures. Each case is checked in TARIC with its tariff code.

How long does an order from Türkiye take?

Road transport takes about a week. The total lead time depends mainly on production; a typical order arrives in 3-4 weeks, and each quotation states its own.

Does the A.TR certificate cover any product?

No. It covers industrial goods in free circulation in Türkiye. It does not cover unprocessed agricultural products or coal and steel; for those, the shipment carries the relevant proof of origin.

Who handles customs clearance?

A customs representative: your forwarder or customs agent. We coordinate with them and prepare the manufacturer’s documentation.

Do you have an import under way?

Tell us the product and the lead time, and we will tell you which documents you need and how we follow it.

Talk to us →